Potassium sulfate production in the year
+43 (0) 1 2800 213 100
Our production locations in Vienna and Styria are first-rate logistic locations in Central Europe. The excellent locations allow us to move our products by rail, ship, truck and pipeline.
On workdays, the logistics team is available from 6:00 a.m. until 8:00 p.m., allowing for a handling of up to 2,000 tonnes per day. This includes the storage of raw materials, as well as the dispatch of our products.
At our plant, we have a tank storage capacity of more than 40,000 m³. With this, we can ensure maximum flexibility and security of supply regarding the storage of both raw materials and our various products.
Potassium sulfate production in the year
Pharmaceutical glycerin production in the year
BioDiesel production in the year
Ölhafen Lobau - Uferstraße 12
1220 Vienna, Austria
+43 (0) 1 2800 213 100
+43 (0) 1 2800 213 301
Potassium sulfate production in the year
Technical glycerin production in the year
BioDiesel production in the year
Leobenerbrückenweg 206
8783 Gaishorn am See, Austria
+43 (0) 50 180 700
+43 (0) 1 2800 213 301